Summerville Solar Farm

Rappville, NSW, Australia

Vaihe
Kehitysvaiheessa
Sijainti
Rappville, NSW
Alue
240ha / 594 acres
Tuotanto
90MW

Tiedot hankkeesta

The Summerville Solar Farm is a 90MWac project located just over 3km east of Rappville, New South Wales. The project includes a 90MWac / 4hr battery. The site was selected for its proximity to the Transgrid network and land free from environmental constraints. For further information, please refer to our Project Information Sheet below.

Development Application

A Development Application (DA) supported by an Environmental Impact Statement (EIS) has now been submitted to the Minister for Planning. The DA and EIS is available on the Major Projects website. For more details please visit:

 https://pp.planningportal.nsw.gov.au/major-projects/projects/summerville-solar-farm

    Further Information

    To read the latest newsletter please select the Documents tab below.

    To contact us please call 03 8595 2406 or email info-au@ox2.com 

    Löydät lisätietoa hankkeesta englanti verkkosivuilta englanti

    Avaintiedot

    Hankkeen avaintiedot

    Teknologia
    Aurinkovoima
    Vaihe
    Kehitysvaiheessa
    Sijainti
    Rappville, NSW
    Alue
    240ha / 594 acres
    Tuotanto
    90MW