Proiecte eoliene onshore

Kraśnik

Kraśnik, Polonia

Stare
In operare
Localitate
Kraśnik
Data de inceput
2024
Productie
79 GWh

Despre proiect

OX2 has completed the construction of the Kraśnik wind farm. The company was involved in the investment as a turnkey builder for investor Equitix. 

The wind farm consists of 7 turbines with a total capacity of 24.15 MW. The estimated annual energy production will be 79 GW, covering the electricity needs of nearly 16,000 households. Vestas 126 turbines with a capacity of 3.45 MW and an overall height of 200 m have been installed on the farm. The project was finalized and commissioned in 2024. 

OX2 is responsible for the technical and commercial management of the project.

 

If you need more information about the project, do not hesitate to contact us:  

Renata Iwanicka
[email protected]
+48 573 451 378

Joanna Tomasiewicz
[email protected]
+48 789 954 824

Mai multe informatii despre proiect pot fi gasite pe pagina aferenta tariia poloneza aferenta tarii poloneza

Puncte cheie ale proiectului

Tehnologie
Proiecte eoliene onshore
Stare
In operare
Localitate
Kraśnik
Turbine
V126 3.45 MW
Inaltime
200 m
Data de inceput
2024
Productie
79 GWh
Contractor
Electrum
Furnizor
Vestas