OX2 has completed the construction of the Wysoka wind farm. The company was involved in the investment as a turnkey developer for investor Ingka Investments.  

The wind farm consists of 11 turbines with a total capacity of 62.5 MW. The estimated annual energy production will be 180 GWh, covering the electricity needs of nearly 90,000 households. Nordex N149 turbines with a capacity of 5.5-5.7 MW have been installed on the farm. The total height of each windmill reaches almost 200 metres, comprising 125-metre towers and 72.4-metre blades. The project was finalised for operation in 2024.   

OX2 is responsible for the technical and commercial management of the project.  

Want to find out more?  

Feel free to contact us about the project Wysoka   

Kasper Kowalewski  

[email protected]  

+48 571 445 871 

Mai multe informatii despre proiect pot fi gasite pe pagina aferenta tariia poloneza aferenta tarii poloneza

Puncte cheie ale proiectului

Tehnologie
Proiecte eoliene onshore
Stare
In operare
Localitate
Wysoka
Turbine
5,5-5,7 MW
Data de inceput
2024
Productie
180 GWh
Contractor
Nordex, Elemont, Mega