Eolico onshore

Kraśnik

Kraśnik, Polonia

Fase
In operazione
Comune
Kraśnik
Data di inizio
2024
Produzione
79 GWh

A proposito del progetto

OX2 has completed the construction of the Kraśnik wind farm. The company was involved in the investment as a turnkey builder for investor Equitix. 

The wind farm consists of 7 turbines with a total capacity of 24.15 MW. The estimated annual energy production will be 79 GW, covering the electricity needs of nearly 16,000 households. Vestas 126 turbines with a capacity of 3.45 MW and an overall height of 200 m have been installed on the farm. The project was finalized and commissioned in 2024. 

OX2 is responsible for the technical and commercial management of the project.

 

If you need more information about the project, do not hesitate to contact us:  

Renata Iwanicka
[email protected]
+48 573 451 378

Joanna Tomasiewicz
[email protected]
+48 789 954 824

Più informazioni sul progetto sono disponibili sul sito Polacco Polacco

Dati di progetto

Tecnologia
Eolico onshore
Fase
In operazione
Comune
Kraśnik
Turbine
V126 3.45 MW
Altezza
200 m
Data di inizio
2024
Produzione
79 GWh
Appaltatore
Electrum
Fornitore
Vestas