Skip to main contentSkip to navigationSkip to search
Logotype
Aerial view of a large solar farm with long rows of blue solar panels surrounded by green and brown fields.

Solar energy

Aurinkonevat

Kauhajoki, Finland

Phase
Under­ development
Location
Kauhajoki
Production
500 GWh
Capacity
500 MW

About the project

Located in Nummijärvi in Kauhajoki, South Ostrobothnia, the Aurinkonevat solar power project is one of the largest solar power projects being planned in Finland. The project area, which covers around 600 hectares, is mainly an old peat extraction area.  

The project aims for an estimated total installed capacity of 500 MW. When completed, the solar power plant will have an estimated annual energy production of 500 GWh, which corresponds to the annual electricity consumption of around 100,000 households (5,000 kWh/household). 

What’s next?  

The planning of the project is under­way.

Project key facts

Technology
Solar energy
Phase
Under­ development
Location
Kauhajoki
Production
500 GWh
Capacity
500 MW
Rows of solar panels in the foreground at sunrise with two wind turbines on the horizon.

Kysymyksiä ja vastauksia aurinkovoimasta

Mitä tarkoittaa teollisen mittakaavan aurinkovoimala? Mitä hyötyä suurista aurinkovoimahankkeista on? Mikä on aurinkovoimalan käyttöikä? Näihin ja moneen muuhun kysymykseen löydät vastaukset koostamastamme materiaalista.

Tutustu kysymyksiin ja vastauksiin

Tilaa hankkeen uutiskirje

Jos haluat saada ajankohtaista tietoa Aurinkonevat aurinkovoimahankkeen etenemisestä, voit tilata hankkeen uutiskirjeen alla olevasta linkistä.

Tilaa uutiskirje

Lue viimeisin uutiskirje

Rows of solar panels on metal frames in a grassy field under a blue sky with thin clouds.

Hankkeen uutisia

Our responsibility

Do you want to know more?

Project contacts for Aurinkonevat

Project manager
Nina Alaiso

+358 40 700 0325
nina.alaiso@​ox2.com

Nina Alaiso

Land use manager
Olli Heinonen

+358 40 353 2219
olli.heinonen@​ox2.com

Olli Heinonen