Onshore wind power
Metsälamminkangas
Vaala, Finland
- Phase
- In operation
- Location
- Vaala
- Commissioned
- 2022
- Production
- 400 GWh
About the project
The Metsälamminkangas wind farm is located in the municipality of Vaala, Finland.
The wind farm consists of 24 wind turbines with a total capacity of 132 MW. The maximum height of the turbines is 230 meters. The estimated annual production of the wind farm is 400 GWh which is equivalent to the annual electricity consumption of about 80,000 households (5,000 kWh/household).
The construction of the Metsälamminkangas wind farm started in 2020 and the wind farm was completed for commercial use in 2022. OX2 is responsible for the technical and commercial management of the wind farm.
Key facts
Project key facts
- Technology
- Onshore wind power
- Phase
- In operation
- Location
- Vaala
- Number of turbines
- 24
- Height
- 220-230 m
- Commissioned
- 2022
- Production
- 400 GWh
- Owner
- Orrön Energy & Sval Energi
- Supplier
- GE
Sustainability
Sustainability
OX2 and our suppliers are guests in the local communities. For us, is extremely important to create dialogue with and show respect for the people who live and work in the local area. This includes transparent communication, creating local jobs, business sector development or financial grants through community funds or property tax, depending on the market and conditions in the area.
The expansion of renewable energy should not come at the expense of nature and it is not enough for us to mitigate climate change. We have long worked to minimize our negative impact on nature and are now taking decisive action towards our goal of nature-positive wind and solar farms by 2030.
Our projects are sustainable by design, from early planning to construction and management.
Accessibility
Accessibility
It is possible to hike, hunt, or pick berries and mushrooms in the wind farm area, with respect to the area's warning signs and prevailing weather conditions. Caution should be observed in certain weather conditions. It is unsafe to be near the wind turbines during thunderstorms and when there is a risk of ice or snow falling from the wind turbines. Therefore, please pay attention to the local weather conditions. Ice accumulation on wind turbines occurs at temperatures just above 0 °C and colder, especially during snowfall or when the turbine is covered with fog or clouds. A safety distance of at least 400 m should be maintained to each wind turbine during these conditions.
Grievance and complaints
Grievance and complaints
Grievance and complaints
The grievance mechanism is targeted towards individuals, communities and companies who have feedback or concerns regarding our projects.
OX2 takes all complaints seriously and aims to acknowledge and resolve complaints promptly. A complaint is a formal expression of dissatisfaction made to or about OX2, related to its project development, construction, operation, or a staff member.
We acknowledge that anyone has a right to lodge a complaint and we will ensure that all the complaints we receive will be managed respectfully, objectively, and efficiently.
Do you want to know more?
Project contacts for Metsälamminkangas
Commercial asset manager
Ilkka Vaaranen
+358 40 676 2711
ilkka.vaaranen@ox2.com
Metsälamminkankaan rakennushanke
Metsälamminkankaan tuulipuiston rakentaminen aloitettiin vuonna 2020 ja saatiin valmiiksi alkuvuodesta 2022. Oheiselta videolta voit katsoa, mitä kaikkea rakennusvaihe piti sisällään. Kesto 3:24.