Phase
In operation
Location
Pieksämäki
Production
400+ GWh

About the project

Niinimäki wind farm is located in the town of Pieksämäki, Finland.

The wind farm consists of 22 wind turbines with a total capacity of 145.2 MW. The total height of the turbines is 250 metres. The estimated annual production of the wind farm is over 400 GWh, which is equivalent to the annual electricity consumption of about 80,000 households (5,000 kWh/household).

The construction of the Niinimäki wind farm started in winter 2022. The wind farm was handed over to its owners Helen and Ålandsbanken Tuulivoima Erikoissijoitusrahasto in September 2025. OX2 is responsible for the technical and commercial management of the wind farm. 

Project key facts

Technology
Onshore wind power
Phase
In operation
Location
Pieksämäki
Number of turbines
22
Height
250 m
Production
400+ GWh
Owner
Helen & Ålandsbanken Tuulivoima Erikoissijoitusrahasto
Supplier
Siemens Gamesa Renewable Energy
Managed by
OX2

Kuvia Niinimäen rakennustöistä

Aerial view of a snowy boreal forest with cleared patches under a cloudy sky.

Hankealuetta maaliskuussa 2023.

Top-down aerial view of a snowy forest with dark green spruces and bare trees.

Hankealuetta maaliskuussa 2023.

Aerial view of a snow-covered forest with a cleared corridor running through the trees under a pale evening sky.

Hankealuetta maaliskuussa 2023.

Aerial view of a large cleared area in a snowy coniferous forest, with bare ground prepared for wind farm construction.

Rakennustöitä huhtikuussa 2023.

Orange excavators and a dump truck working on a cleared construction site at Niinimäki wind farm, with workers in hi-vis vests nearby.

Rakennustöitä huhtikuussa 2023.

Excavators and workers in hi-vis vests on a wide cleared construction site at the Niinimäki wind farm, with forest on the horizon.

Rakennustöitä huhtikuussa 2023.

Aerial view of an orange excavator and a blue dump truck working on a snowy construction road in a forest.

Hankealueen tien rakennustöitä keväällä 2023.

Aerial view of a wind turbine foundation site in a forest, with a circular gravel pad, machinery and a small vehicle.

Voimalaperustusten maanrakennustöitä syyskuussa 2023.

Aerial view of a circular reinforcement cage for a wind turbine foundation, with a yellow mobile crane, pallets and workers beside a forest.

Voimalaperustusten raudoitustöitä syyskuussa 2023.

Aerial view of a wind turbine foundation pour with a concrete pump boom, mixer truck, vans and workers in hi-vis clothing; truck labelled Kuula Oy.

Voimalaperustusten valutöitä syyskuussa 2023.

Aerial view of a construction site and gravel road cutting through autumn forest.

Hankealuetta lokakuussa 2023.

Aerial view of a circular wind turbine foundation covered with a turquoise tarp, on a gravel work area next to forest.

Voimalaperustusten rakennustöitä lokakuussa 2023.

Aerial view of a concrete pump truck beside an excavated pit with a square foundation base and anchor bolts.

Voimajohtolinjan perustustöitä lokakuussa 2023.

Aerial view of a forest clearing with two rectangular concrete structures under construction and excavators.

Sähköaseman perustustöitä lokakuussa 2023.

Niinimäki, Finland

Voimalakuljetuksia elokuussa 2024.

Niinimäki, Finland

Voimalapystytyksiä marraskuussa 2024.

Niinimäki wind farm, Finland

Niinimäen tuulipuisto elokuussa 2025.

Hankkeen uutisia

Our responsibility

Do you want to know more?

Project contacts for Niinimäki

Commercial asset manager
Taru Kaarlela

+358 40 623 3995
taru.kaarlela@​ox2.com

Taru Kaarlela