Logotype

éolien terrestre

Kraśnik

Kraśnik, Pologne

Stade
En cours de construction
Emplacement
Kraśnik
Date de demarrage
2024
Production
79 GWh

À propos du projet

The Kraśnik wind farm is under construction. The company is involved in the investment as a turnkey construction company for Equitix.

The wind farm consists of 7 Vestas V126 wind turbines with a total capacity of 24,15 MW. The estimated annual energy production of the wind farm is 79 GWh, which is equivalent to the annual electricity consumption of about 16,000 households (5,000 kWh/household). The total height will be 200 meters. The entire project should be finalized and handed over into operations by the end of 2024. The general contractor is Electrum.

Emergency phone for construction – related matters:

+48 780 107 667

Pour des informations complémentaires rendez-vous sur le site Polonais Polonais

Faits marquants

Faits marquants du projet

Technologie
éolien terrestre
Stade
En cours de construction
Emplacement
Kraśnik
éoliennes
V126 3.45 MW
hauteur
200 m
Date de demarrage
2024
Production
79 GWh
Contractant
Electrum
Fournisseur
Vestas

Pour en savoir plus

Contacts projet Kraśnik

Chef de projet
Piotr Winkiel

+48 573 435 698
piotr.winkiel@​ox2.com