Logotype

Lądowa energetyka wiatrowa

Puutikankangas

Sievi, Finlandia

Etap
W eksploatacji
Gmina
Sievi
Data rozpoczęcia
2023
Produkcja
155 GWh

O projekcie

The Puutikankangas wind farm is located in the municipality of Sievi, Finland.

The wind farm consists of 8 wind turbines with a total capacity of 44 MW. The maximum height of the turbines is 240 meters. The estimated annual production of the wind farm is 155 GWh which is equivalent to the annual electricity consumption of about 30,000 households (5,000 kWh/household).

The construction of the Puutikankangas wind farm started in 2021 and the wind farm was completed for commercial use in early 2023. The wind farm was handed over to its owner Renewable Power Capital (RPC) in March 2023.

OX2 is responsible for the technical and commercial management of the wind farm.

Więcej informacji o projekcie można znaleźć na fińskie stronie, at szwedzkie i fińskie

Kluczowe fakty

Kluczowe dla projektu fakty

Technologia
Lądowa energetyka wiatrowa
Etap
W eksploatacji
Gmina
Sievi
Turbiny
8
Wysokość
240 m
Data rozpoczęcia
2023
Produkcja
155 GWh
Właściciel
RPC
Dostawca
GE
Zarządzany przez
OX2

Chcesz dowiedzieć się więcej?

Kontakt w sprawie projektu dla Puutikankangas

Kierownik aktywów komercyjnych
Patrik Back

+358 50 355 4654
patrik.back@​ox2.com