Logotype

Landbaserad vindkraft

Kraśnik

Kraśnik, Polen

Fas
Byggnationsfas
Plats
Kraśnik
Driftstart
2024
Produktion
79 GWh

Om projektet

The Kraśnik wind farm is under construction. The company is involved in the investment as a turnkey construction company for Equitix.

The wind farm consists of 7 Vestas V126 wind turbines with a total capacity of 24,15 MW. The estimated annual energy production of the wind farm is 79 GWh, which is equivalent to the annual electricity consumption of about 16,000 households (5,000 kWh/household). The total height will be 200 meters. The entire project should be finalized and handed over into operations by the end of 2024. The general contractor is Electrum.

Emergency phone for construction – related matters:

+48 780 107 667

More information om projektet på polska

Nyckelfakta

Projektets nyckelfakta

Teknologi
Landbaserad vindkraft
Fas
Byggnationsfas
Plats
Kraśnik
Antal turbiner
V126 3.45 MW
Höjd
200 m
Driftstart
2024
Produktion
79 GWh
Contractor
Electrum
Leverantör
Vestas

Vill du veta mer?

Projektkontakter för Kraśnik

Projektledare
Piotr Winkiel

+48 573 435 698
piotr.winkiel@​ox2.com